The Upper Big Blue NRD needed new office space and wanted to create a campus that reflected its roll of preserving and protecting natural resources and the environment. The drainage challenges of the 10-acre site selected for the project provided opportunity to showcase some of the sustainable practices promoted by the agency.
"
"
"
Description
The project included construction of a 14,000 square foot office building and a 10,000 square foot maintenance and storage building. Soil needed to create building pads was excavated on-site to create a rain garden and a constructed wetlands area. Drainage on the site was managed solely using surface flow – sheet flow from pavements was released onto grassed areas and concentrated flows was directed to surface swales draining to the pond areas.
Key Partners
Ayars & Ayars, Inc.
Architecture Etcetera
Upper Big Blue NRD