This project converted an existing gravel road to a three-lane urban section along a new profile. The project included a new 8’x8’ box culvert to replace an existing 72” pipe. Potholing and utility coordination was required to relocate a 16” water main and gas line.
Key Partners
Sarpy County
Sumtur Crossing – SID #328
BelTerra – SID #344
TAB Construction