While constructing their new concrete batch plant, Concrete Supply Inc. determined that an SPCC (Spill Prevention Control and Countermeasure) was necessary since they store a 12,000-gallon diesel AST (aboveground storage tank) to fuel their concrete trucks.

Description

E&A developed a Tier II SPCC in compliance with the Spill Prevention Control and Countermeasure Plan Regulation 40 CFR 112 and had it certified by one of our professional engineers. The new 12,000-gallon diesel AST is double-walled to capture leaks internally and is now protected with concrete bollards to prevent trucks or equipment from accidentally colliding with it. The AST also has an alarm, a fuel check and drip buckets to further prevent unauthorized usage and spills. The maintenance bay was also built with two, oil-water separators to prevent spills and leaks from discharging outside from the facility. The SPCC was completed and implemented in 2019.

Key Partners

Concrete Supply Inc.

Services Provided

Spill Prevention Control and Countermeasure Plan (SPCC) – PE Certified