Project Description
E&A provides annual Post-Construction Stormwater Management Plan (PCSMP) inspections for Madonna Rehabilitation Hospital, a 138,000-square-foot medical facility located on a 20-acre site in Village Pointe. Madonna Rehab is responsible for maintaining two dry detention basins, a grassed swale, four bioretention gardens, and an area of porous pavers for post-construction stormwater treatment. Porous pavers treat stormwater underground, while bioretention basins and swales manage runoff above ground. E&A was hired to conduct these inspections and prepare reports per City of Omaha requirements.
Note: As of July 1, 2008, the City of Omaha requires the installation of post-construction stormwater management features as part of new land development to comply with the requirements in their Municipal Separate Storm Sewer System (MS4) permit. Post-construction stormwater management applies to land development that results in an increase of impervious surface area greater than 5,000 square feet.
Key Partners
Madonna Rehabilitation
City of Omaha
Papillion Creek Watershed Partnership (PCWP)
Services Provided
"
"
"
"
"